How to improve customer trust with post-incident reviews

Jake Bartlett
9 min read
Once an incident is over, it's hard to feel excited about looking back on what went wrong and what you could improve. Incidents aren't necessarily proud moments, and they're often stressful. A simple mistake might lead to all-hands-on-deck, late-night troubleshooting, and upset customers.
All you want is for the incident to be resolved and to go back to normal work. And that's why you and your team might feel inclined to skip the post-incident review. But that's a critical mistake.
Properly run post-incident reviews can transform your product and your team, shaping a culture of accountability, learning, and continuous improvement. The result is a more reliable product and a team your customers can trust.
In this article, we'll explore what a post-incident review (PIR) is, when and why you should conduct one, and how a solid PIR process can build trust with customers.
Key takeaways
- A post-incident review (PIR) is the process, document, and meeting used to understand what happened during an incident, why, and how to prevent it from recurring.
- Skipping PIRs is tempting when teams are busy, resource-strapped, or lack a defined owner, but each of those has a fix.
- Sharing PIR learnings with customers builds trust by showing accountability, transparency, and real commitment to improvement.
- A good PIR is blameless, well documented, involves the right people, and ends in assigned follow-up actions.
What is a post-incident review?
A post-incident review (PIR) is the process of understanding what happened, why it happened, and how it was resolved. The end goal of a PIR is to learn, improve, and reduce the chances of the same incident happening again.
Historically, PIRs were referred to as "postmortems". However, over the last decade, many incident teams have moved away from using the term postmortem, which can imply failure and death, and instead prefer terms like post-incident review or retrospective. These alternatives emphasize learning, improvement, and team collaboration.
A post-incident review typically identifies a timeline of events, root cause analysis, lessons learned, and clearly defined action items. A PIR can involve everyone from SRE, engineering, Ops, customer support, and anyone else who was impacted or has insights to contribute.
A PIR is a process that typically results in a document, and it may include a meeting as part of that process. Let's break it down:
- PIR as a process: A structured look back at an incident to understand what happened, why, and how to prevent it from happening again. It involves gathering timelines, facts, and insights from people involved.
- PIR as a document: The formal written report that captures findings from the PIR process. A public PIR usually includes an incident summary, timeline, contributing factors, impact, and root cause. An internal version of a PIR might also include what went well, what didn't go well, and action items for the team.
- PIR as a meeting: A collaborative session with key stakeholders to review the incident and discuss insights. This meeting can be a critical part of the learning process and helps align people on the next steps.
Does every PIR need a document and dedicated meeting?
Not every incident needs a post-incident review, and not every PIR needs a meeting or a public write-up. For smaller issues, a quick internal note may be enough. And in many cases, teams run PIRs asynchronously, especially when working across time zones. The key is having a process that matches the scale and impact of the incident.
How your team conducts a PIR and whether you choose to share a PIR document with customers is up to you. We'll share some best practices on this later in this article, but the most important thing to do is to consider customer impact as well as their expectations.
Why it's easy to skip a post-incident review
Some incidents might not need a full-blown PIR. But sometimes skipping a PIR can be a big mistake, especially if the impact is high and customers expect some sort of follow-up from you.
Here are some common reasons teams choose to skip a PIR:
It's tempting to move on
There are always competing priorities and other fires to be fighting. Many teams deprioritize post-incident reviews to stay on course, hit deadlines, and maintain development velocity. They think, "The incident is over, let's just move on".
Mindset shift: Taking the time to conduct a PIR can actually save you time in the long run. By identifying critical areas for improvement, you can reduce the chances of the same incident happening again.
Conducting a PIR requires a lot of resources
Pulling multiple people away from their priorities to conduct a PIR is costly. Think about it: you've got a couple of SREs, an engineering lead, a support lead, and maybe a product manager all spending an hour or more to create a PIR. That could cost the company thousands of dollars.
Mindset shift: Invest in the PIR now to save money down the road. When done well, a post-incident review has a lasting impact and helps your team and product become stronger.
A fear of blame
If the team culture isn't blameless, people may avoid PIRs to dodge uncomfortable decisions and awkward conversations.
Mindset shift: Avoid finger-pointing. Build a blameless incident management culture to create a safe space for productive conversations. This ultimately unites the team and creates stronger relationships.
No clear owner or process
Many teams skip the post-incident review process because they haven't defined a process or owner. If it's nobody's job to lead the PIR, then it's likely to fall through the cracks.
Mindset shift: Define which team or role is responsible for conducting a post-incident review and create a standardized process for when and how you do PIRs.
Not seeing the value
If past PIRs have felt like checking a box with no follow-up, teams won't be motivated to do them again. If this is the case, you might need to refine your process for reviewing incidents, ensuring you run them for the right incidents and always have follow-up action items.
Mindset shift: Consider why your previous PIRs didn't feel useful. Define a clear decision framework for why, when, and how you conduct post-incident reviews moving forward.
How post-incident reviews build customer trust
When something goes wrong, customers don't just want to know you fixed it; they want to know what you learned. PIRs force you to look deeper and send a signal to customers that your team takes incidents seriously, values transparency, and is committed to improving over time.
Shows accountability
PIRs give customers confidence that you're doing the hard work, and you're following through to improve their experience in the future. They show customers you're not hiding behind vague explanations or blaming external factors. Instead, you're owning the issue, analyzing it, and sharing outcomes.
Increases transparency
When you share key learnings with customers, it shows you're not afraid to pull back the curtains and give them an inside look at what went wrong. Showing exactly what happened and what you're doing to prevent a repeat incident is a true commitment to transparency, which builds trust.
Shows commitment to improvement
A public PIR process signals that your team doesn't just fix problems reactively. You invest in systems, training, and processes to get better over time. This proactive approach builds confidence that future incidents will be handled even more effectively.
Faster future response
The more you learn from past issues, the better you get at spotting patterns and resolving incidents faster in the future. Whether it's product issues you uncover or internal processes that need ironing out, identifying them during a PIR is key. This turns each incident into an opportunity to strengthen both your product and your response strategy.
Improves internal collaboration
Post-incident reviews bring together people from different teams, like engineering, support, and product. This cross-functional collaboration strengthens relationships and improves how teams work together during future incidents.
Best practices for running a post-incident review
Whether you're running your first PIR or refining an existing process, these best tips will help you get the most value from each PIR:
Keep it blameless
Mistakes happen. The goal isn't to find someone to blame. It's to understand the systems, processes, or assumptions that led to the incident happening. A blameless culture encourages honesty and makes PIRs more effective.
Document everything
Keep a clear record of what happened, when, and who was involved. Logs, screenshots, and timelines are your friends here. The more detail you capture during and immediately after the incident, the easier it will be to piece together the story later.
Involve the right people
Get input from everyone who was part of the incident response, as well as anyone who might offer a valuable perspective. This could include engineers, support staff, product managers, and even customers in some cases.
Focus on systems, not individuals
When analyzing root causes, look at the conditions that allowed the incident to happen rather than pointing fingers. Did a deployment process fail? Was monitoring inadequate? Did communication break down? These are the questions to ask.
Create actionable follow-ups
A PIR without action items is just a story. Make sure every review ends with clear, assigned tasks that will prevent the issue from happening again or improve response if it does. Track these items to completion.
Share learnings
Don't keep insights siloed. Share your PIR internally so other teams can learn from it. And when appropriate, share a public version with customers to demonstrate transparency and build trust.
A post-incident review template
Every team has different needs when it comes to creating a PIR doc. But if you’re just getting started, here's what to include:
- Incident summary: Briefly describe what happened, when it occurred, and how long it lasted.
- Impact: Who was affected? What services or features were impacted? How many users were impacted?
- Timeline: List key events in chronological order. Include detection, response actions, and resolution.
- Root cause: What ultimately caused the incident? Include any contributing factors or systems involved.
- Actions taken: What was done to resolve the issue? Any temporary or emergency fixes?
- Follow-up actions: What changes are being made to prevent recurrence? Who is responsible, and what are the timelines?
- Support impact: H How many support tickets were received about the incident?
- Customer communication: Link to a status page incident update (if public) and a summary of how the issue was communicated to users.
- Lessons learned: What went well? What could have gone better? Where did we get lucky?
PIR examples
Let's look at some examples of post-incident reviews shared publicly by some notable companies.
Example 1: CrowdStrike

What they did well: CrowdStrike's famous 2024 outage rocked the world. But they did a great job providing high-level detail and technical information. Their PIR leaves little room for follow-up questions.
Example 2: Docker

What they did well: Docker's PIR is very well written. Their introduction quickly explains what happened and why.
Example 3: Linear

What they did well: Linear provided a detailed timeline of events, which is a key component of a good post-incident review.
Creating a post-incident review in Sorry™
Sorry™ makes it easy to share post-incident reviews with customers. When you're ready to share your PIR, simply head over to the incident and write a new update:

You can format your post-incident review using our WYSIWYG. Here's an example of a PIR we shared recently:

Trust comes from clear communication
Customers don't expect perfection, but they do expect honesty and improvement. Post-incident reviews give you a chance to communicate clearly, take ownership, and show you're learning from what went wrong.
Are you looking for an easy way to share post-incident reviews with your customers? Start a free trial of Sorry™ today!
FAQ
What's the difference between a post-incident review and a postmortem?
They refer to the same process: a structured look back at an incident to understand what happened, why, and how to prevent it from recurring. Many teams have moved away from the "postmortem" term because it can imply failure or blame. Modern teams prefer "post-incident review" or "retrospective" to emphasize learning instead.
Does every incident need a post-incident review?
No, some smaller issues may not need a post-incident review. But high-impact incidents that affect customers usually warrant a full PIR with a meeting and a written report shared with customers. The right scope depends on the incident's severity and what your customers expect.
What should a post-incident review (PIR) include?
At minimum, a PIR should include an incident summary, timeline, root cause, impact, and follow-up action items. Internal versions often go further, adding what went well, what didn't, and lessons learned so the team can improve next time.
Who should be involved in the PIR process?
Anyone who took part in the response or has useful insight or domain knowledge. That often includes people from engineering, SRE, support, and product. In some cases, it's also worth involving customers, especially when their feedback can clarify impact or expectations.
Interested in improving your incident communication process?
We provide the easiest status page tool for handling incident communication through multiple channels.